Bicycle amenities at the Juniper Canyon east trailhead


Juniper Canyon

Upon completion, the Juniper Canyon recreation area will feature 72 acres of open space, connecting the residential, commercial, and educational areas from the east side of Mountain View Corridor to the Herriman hills trail system and open space west of Juniper Crest Road. The designs of each phase are finalized and built as funding allows.

The first phase, a trailhead on the eastern side, was completed in fall 2022. Learn more about this trailhead and view additional conceptual designs for future phases of the overall project below:






Phases

Phase 1: The East Trailhead

Completed November 2022

The Juniper Canyon East Trailhead is located at 4094 West Autumn Spring Drive. The park has water-efficient landscaping surrounding the bicycle playground and in the park strips. The adjacent detention basin is landscaped with a drought-tolerant grass seed mix. This area includes the following amenities:

  • Bicycle playground (called the Pit)
  • Pump track
  • Bike rack
  • Bike repair station
  • Restrooms
  • Kiosk trail map sign
  • Parking lot
  • Benches
  • Picnic tables
  • Pavilion
  • Drinking fountain
  • Paved trail
Aerial image showing the Juniper Canyon east trailhead with bike amenities, restroom, and pavilion.

Groundbreaking ceremony | March 1, 2022

Phase 1 (East Trailhead) Ribbon Cutting | November 2, 2022






Phase 2: Extended and Connected Trails

Completed November 2024

Addition of 3,500 feet of asphalt trail, including a connection from the east trailhead to the Skyridge and Summit View neighborhoods winding up the hillside. Native, drought-tolerant grass seeding as well.

Close-up image of an asphalt trail in Juniper Canyon's second phase in November 2024
Members of the Herriman City Council and staff stand with representatives from Salt Lake County, construction crews, and other members of the public to ceremoniously cut the ribbon to celebrate the opening of Juniper Canyon's second phase.

Phase 2 Ribbon Cutting (trail extension and connections) | November 20, 2024






Phase 3: The West Trailhead and Bike Jump Park

Anticipated completion: Fall 2026

  • New western trailhead: Located along Juniper Trail Drive, the trailhead will provide another access to Juniper Canyon. The design includes a restroom facility, 30+ parking stalls, benches, and a pavilion.
  • Progression-based bicycle jump park: Located near the new western trailhead, the jump park will feature elements suitable for a range of skill levels, from beginners to advanced riders. The facility is being funded and constructed by the Friends of Herriman.